Montana has a lot at stake in B.C. mining proposal

This project, dubbed the “Mist Mountain Project,” would cover an area the size of the city of Tucson, Ariz. (193 sq. mi.).  The CBM project would transform a source of our clean water and a vital wildlife haven into a single-use, industrial zone with 1500 CBM wells, attendant road networks, compressor and pump stations, gas flares and power lines.  The effluent and runoff would arrive in Flathead Lake in 72 hours.  Glacier Park and Flathead River and Lake would be forever damaged.

Read the entire story here:

http://www.headwatersnews.org/Letter.Hadden021908.html